Asset Extraction
Nov. 17th, 2018 11:50 amReference Number: IX23XI
Project Dates: 11/17/2018
Means of transport into/out of "Thule":
Means of transport within Thule: Extradition
Number Participants: 1 (plus up to but no more than three true blood relatives).
Cargo listing in Tons (include all hazards): NatSec.
Special requests (be very specific): Julian Assange to be considered a strategic asset. In reference to "Catch him because we can". In conjunction with Paperclip*.
Lodging: undisclosed
Vehicles: undisclosed
Communications: To be overseen by the U.S. Cyber Command.
Cargo/Passenger Transportation (air/land): undisclosed.
Security: ATS
Supply: undisclosed
Fuels: undisclosed
Engineering: A19 TAU
Medical: FULL
Contact Information: Hexterior
*Small projects are considered: <20 personnel, less than one ton equipment, and not require support from more than two functional areas (ex. communications, supply, transportation). Small projects need to be submitted NLT 90 days prior to execution date. All other projects will be considered as large and will require to be submitted NLT 180 days prior to execution date.
Project Dates: 11/17/2018
Means of transport into/out of "Thule":
Means of transport within Thule: Extradition
Number Participants: 1 (plus up to but no more than three true blood relatives).
Cargo listing in Tons (include all hazards): NatSec.
Special requests (be very specific): Julian Assange to be considered a strategic asset. In reference to "Catch him because we can". In conjunction with Paperclip*.
Lodging: undisclosed
Vehicles: undisclosed
Communications: To be overseen by the U.S. Cyber Command.
Cargo/Passenger Transportation (air/land): undisclosed.
Security: ATS
Supply: undisclosed
Fuels: undisclosed
Engineering: A19 TAU
Medical: FULL
Contact Information: Hexterior
*Small projects are considered: <20 personnel, less than one ton equipment, and not require support from more than two functional areas (ex. communications, supply, transportation). Small projects need to be submitted NLT 90 days prior to execution date. All other projects will be considered as large and will require to be submitted NLT 180 days prior to execution date.